Keeping You Moving. Beyond Expectations.
Worker-safety sidewalk clearing for Western Washington industrial facilities, keeping crew walkways between buildings and lots clear across every shift.
Industrial Facility Sidewalk Clearing in Edgewood covers the walks, entrances and pedestrian routes that workers use every day. Edgewood has 9 industrial sites on the map, and each has lots, walks or entrances that need to stay clear.
Washington Snow Removal is based in Bothell, WA, and is licensed, bonded and insured. Edgewood is 66 minutes from our yard. Snow here is light, about 6.8 in a season, but 30 freezing nights from October to April mean ice is a bigger issue than depth. Call 206-809-9669 to talk through your site.
Sources: NOAA and National Weather Service records for Edgewood, 2005–2026.
At an industrial facility, the sidewalk work is hand work. Crew members shovel the walks from the parking area to the doors, clear loading office entrances and spread ice melt where foot traffic is heaviest. Where a site has long runs of walk, we can add a Kubota SCL1000 compact track loader with operator.
Edgewood sees about 2.1 days a year with 1 in or more of snow. That is not many. The more common problem is a thin layer of snow or frost on a freezing night. About 3.62 light-snow days a year need deicing. Freezing rain has also been reported near Edgewood, including Freezing Rain near Puyallup on Jan 19 and Jan 20, 2012. Glazed walks like that are slick even with no snow on the ground.
Pricing for a typical visit:
Each dispatch has a 2-hour minimum. Because the drive from Bothell is 66 minutes, we suggest planning your site before the first freeze.
Billed by the hour for the crew and equipment on site, plus materials.
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Compact track loader with operator (Kubota SCL1000) | $175 / hour |
| Ice melt, bagged | $45 / 50 lb bag |
| Trip charge for Edgewood (zone C) | $350 / dispatch |
Prices approved Oct 2026.
Edgewood has 9 industrial sites on the map, each with lots, walks or entrances to keep clear.
Source: OpenStreetMap contributors, Oct 2026. Named sites are examples of local facilities, not customers.
Reduces Washington L and I worker injury claims and lost time; Shift-change timing matches around-the-clock operations; Yard walkways and gate approaches cleared, not just lots; Targets meltwater refreeze between heated and cold zones; Keeps production moving without weather-related stoppages