Keeping You Moving. Beyond Expectations.
Worker-safety sidewalk clearing for Western Washington industrial facilities, keeping crew walkways between buildings and lots clear across every shift.
Industrial sites in Puyallup have walkways that workers use at every shift change. Snow is not frequent here, but a thin layer can turn to ice on a freezing night. Washington Snow Removal clears sidewalks, entrances and walkways at industrial facilities in Puyallup.
We are licensed, bonded and insured, and we work from our Bothell yard. Puyallup has 24 industrial sites mapped, including the Bus Depot, Coho Business Park, Girard Wood Products and Shope Concrete Products. Call 206-809-9669 to set up service for your facility.
Sources: NOAA and National Weather Service records for Puyallup, 2005–2026.
Industrial sidewalk clearing covers the paths people walk: employee entrances, walkways from parking, loading office doors and paths between buildings. Crews shovel by hand, clear snow to the pavement and spread ice melt where ice can form.
Puyallup averages 7.8 inches of snow per season, and snow lies on the ground about 5 days a year. Days with 1 inch or more average 2.4, yet 80% of winters have at least one. The area also sees 29 freezing nights from October to April. That means refreeze is often a bigger problem than depth, so ice control matters as much as shoveling.
Big storms do happen. Feb 12–15, 2021 brought 14.2 inches in total, with 9.3 inches on the biggest day. Feb 5–6, 2017 brought 10.6 inches.
Pricing is listed up front:
Each dispatch has a 2-hour minimum. Puyallup is 69 minutes from our Bothell yard.
Billed by the hour for the crew and equipment on site, plus materials.
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Compact track loader with operator (Kubota SCL1000) | $175 / hour |
| Ice melt, bagged | $45 / 50 lb bag |
| Trip charge for Puyallup (zone C) | $350 / dispatch |
Prices approved Oct 2026.
There are 24 industrial sites mapped within Puyallup.
Source: OpenStreetMap contributors, Oct 2026. Named sites are examples of local facilities, not customers.
Reduces Washington L and I worker injury claims and lost time; Shift-change timing matches around-the-clock operations; Yard walkways and gate approaches cleared, not just lots; Targets meltwater refreeze between heated and cold zones; Keeps production moving without weather-related stoppages