Keeping You Moving. Beyond Expectations.
Worker-safety sidewalk clearing for Western Washington industrial facilities, keeping crew walkways between buildings and lots clear across every shift.
Industrial facility sidewalk clearing in Tacoma means keeping the public walks and worker paths around your site clear of snow and ice. Washington Snow Removal is licensed, bonded and insured, and we dispatch from our Bothell yard, 73 minutes away.
Tacoma has 201 industrial sites mapped within the city, from reservoirs to wastewater plants to manufacturers. Snow is rare here, but when it comes, walks need attention fast. Under TMC 9.16.050, the person in charge of a premises must clear the public walks along or in front of it. The deadline is 24 hours.
Sources: NOAA and National Weather Service records for Tacoma, 2005–2026.
At an industrial site, the sidewalk work usually covers public walks along the frontage, employee entrances, and paths from parking areas to the building. Crews shovel by hand, clear to the pavement, and apply ice melt where needed. For longer frontages, a compact track loader with operator can help move heavy snow.
Tacoma's pattern is unusual. The city averages 5.6 in of snow per season, but only 1.6 days a year reach 1 in or more. About 62% of winters see at least one 1-inch day. Snow is on the ground about 3 days a year, and only 1.3 days a year stay below freezing. Still, there are 31 freezing nights from October to April, so refreeze on walks is a bigger routine risk than deep snow.
Big storms do happen. Since 2005, Feb 12-15, 2021 brought 11.0 in total, and Feb 5-7, 2017 had a 7.2 in peak day. Because the 24-hour clock under TMC 9.16.050 applies after these events, we plan around it.
Pricing is posted openly:
Each dispatch has a 2-hour minimum. Call 206-809-9669 to talk through your site.
Billed by the hour for the crew and equipment on site, plus materials.
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Compact track loader with operator (Kubota SCL1000) | $175 / hour |
| Ice melt, bagged | $45 / 50 lb bag |
| Trip charge for Tacoma (zone C) | $350 / dispatch |
Prices approved Oct 2026.
There are 201 industrial sites mapped within Tacoma.
Source: OpenStreetMap contributors, Oct 2026. Named sites are examples of local facilities, not customers.
Reduces Washington L and I worker injury claims and lost time; Shift-change timing matches around-the-clock operations; Yard walkways and gate approaches cleared, not just lots; Targets meltwater refreeze between heated and cold zones; Keeps production moving without weather-related stoppages