Keeping You Moving. Beyond Expectations.
Worker-safety sidewalk clearing for Western Washington industrial facilities, keeping crew walkways between buildings and lots clear across every shift.
Industrial Facility Sidewalk Clearing in Fife covers the walkways that workers use every shift: parking lot paths, entry doors, dock-side walks and gate approaches. Washington Snow Removal sends crews from our Bothell yard, 65 minutes away. We are licensed, bonded and insured.
Fife gets little snow, an average of 5.8 in per season. But 52 industrial sites are mapped here, and a single icy morning can affect a shift change. We clear snow by hand and treat walks with ice melt so staff can get in and out safely.
Sources: NOAA and National Weather Service records for Fife, 2005–2026.
Snow is rare in Fife. There are about 4 days a year with snow on the ground and 1.8 days with 1 in or more. Still, 71% of winters have at least one 1-inch day. Most of the work is small and fast, and ice is the bigger concern. There are 27 freezing nights between October and April, and about 3.29 light-snow days a year need deicing.
Big events do happen. Since 2005, the biggest storm was Jan 15-20, 2012, with 12.4 in total. Feb 12-15, 2021 brought 8.9 in, with 5.7 in on the biggest day. Walks at a facility need a plan for those days, not just for a dusting.
Pricing is posted plainly. Crew members are $110 per person-hour. The Kubota SCL1000 compact track loader with operator is $175 per hour. Ice melt is $45 per 50 lb bag. The Fife trip charge is $350 per dispatch, and each dispatch has a 2-hour minimum. Call 206-809-9669 to set up service.
Billed by the hour for the crew and equipment on site, plus materials.
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Compact track loader with operator (Kubota SCL1000) | $175 / hour |
| Ice melt, bagged | $45 / 50 lb bag |
| Trip charge for Fife (zone C) | $350 / dispatch |
Prices approved Oct 2026.
There are 52 industrial sites mapped within Fife.
Source: OpenStreetMap contributors, Oct 2026. Named sites are examples of local facilities, not customers.
Reduces Washington L and I worker injury claims and lost time; Shift-change timing matches around-the-clock operations; Yard walkways and gate approaches cleared, not just lots; Targets meltwater refreeze between heated and cold zones; Keeps production moving without weather-related stoppages