Keeping You Moving. Beyond Expectations.
Worker-safety sidewalk clearing for Western Washington industrial facilities, keeping crew walkways between buildings and lots clear across every shift.
Industrial Facility Sidewalk Clearing in Gig Harbor covers the walkways workers use every shift: from parking areas to entrances, along building edges, and around gates. Washington Snow Removal is licensed, bonded and insured, and we work from our Bothell yard, 84 minutes away.
Snow is rare here. Gig Harbor averages 5.5 in per season and about 1.5 days a year with 1 in or more. When it does arrive, a thin layer can turn to ice on a cold night. Call 206-809-9669 to talk through your site.
Sources: NOAA and National Weather Service records for Gig Harbor, 2005–2026.
OpenStreetMap lists 7 industrial sites inside Gig Harbor city limits, including the City of Gig Harbor Wastewater Treatment Plant. Sites like these have employees on foot at all hours, so walkways need to be safe even when the snow is light.
The work is mostly hand work. Crews shovel and clear sidewalks, entrances and pedestrian routes, then apply ice melt where needed. For wider areas, a compact track loader with operator can be added.
Each dispatch has a 2-hour minimum.
The local pattern shapes the plan. Gig Harbor sees about 3 days a year with snow on the ground and only 1.0 day that stays below freezing. But there are 31 freezing nights between October and April. That means ice is often the bigger concern than depth. Recent events logged for the area include Winter Weather on Dec 1, 2022, and Heavy Snow on Feb 8, 2019 and Feb 5, 2017. Events are infrequent, so most facilities do better calling for service as needed than planning around constant snowfall.
Billed by the hour for the crew and equipment on site, plus materials.
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Compact track loader with operator (Kubota SCL1000) | $175 / hour |
| Ice melt, bagged | $45 / 50 lb bag |
| Trip charge for Gig Harbor (zone C) | $350 / dispatch |
Prices approved Oct 2026.
OpenStreetMap lists 7 industrial sites inside Gig Harbor city limits.
Source: OpenStreetMap contributors, Oct 2026. Named sites are examples of local facilities, not customers.
Reduces Washington L and I worker injury claims and lost time; Shift-change timing matches around-the-clock operations; Yard walkways and gate approaches cleared, not just lots; Targets meltwater refreeze between heated and cold zones; Keeps production moving without weather-related stoppages