Keeping You Moving. Beyond Expectations.
We clear large industrial lots and truck approaches so Western Washington operations keep running through winter weather.
Industrial lots in Pacific work around the clock. Trucks come and go, and loading areas have to stay open. Washington Snow Removal plows and treats industrial facility parking lots in Pacific, working out of our Bothell yard, 60 minutes away. We are licensed, bonded and insured.
Pacific averages 6.5 in of snow per season, and the biggest single day since 2005 was 9.2 in. OpenStreetMap lists 59 industrial sites inside city limits, including AmeriGas, Miles Sand and Gravel, Puget Sound Truck Sales and Titan Earthwork. Call 206-809-9669 to set up service for your site.
Sources: NOAA and National Weather Service records for Pacific, 2005–2026.
An industrial lot is not a retail lot. It has truck lanes, dock aprons, gates and yard space, and each needs its own plan. We plow the main drive lanes first, then work through staging areas and employee parking. Crew members clear walkways and entries by hand.
Pacific does not see much snow. It gets about 2.1 days a year with 1 in or more. But it logs 28 freezing nights from October to April, and about 2.67 light-snow days a year need deicing. Thin snow and refreezing meltwater often cause more trouble than a deep storm. Recent events fit that pattern: an ice storm on Jan 17, 2024, a cold snap on Jan 12, 2024, and a winter storm on Feb 12, 2021.
Our equipment and rates for industrial work:
Each dispatch has a 2-hour minimum and a $275 trip charge for Pacific (zone B).
Billed by the hour for the crew and equipment on site, plus materials.
| Plow truck with driver (Ram 3500) | $250 / hour |
| Plow and spreader truck with driver (Ram 5500) | $325 / hour |
| Compact track loader with operator (Kubota SCL1000) | $175 / hour |
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Ice melt, bagged | $45 / 50 lb bag |
| Bulk salt, applied | $300 / ton |
| Trip charge for Pacific (zone B) | $275 / dispatch |
Prices approved Oct 2026.
OpenStreetMap lists 59 industrial sites inside Pacific city limits.
Source: OpenStreetMap contributors, Oct 2026. Named sites are examples of local facilities, not customers.
Large lots and truck approaches stay open to protect production; semi turning areas and gate approaches are cleared for heavy vehicles; dock ramps are deiced so loaded trailers keep traction; passes are timed around shift changes for every crew; scalable equipment matches the acreage of an industrial site