Keeping You Moving. Beyond Expectations.
We keep active Western Washington job sites open by clearing access roads, staging areas, and material yards so winter weather does not halt your build schedule.
Snow on a construction site in Renton slows deliveries, buries staging areas and leaves ice on access roads and walkways. Washington Snow Removal clears active job sites from our Bothell yard, 37 minutes away. We are licensed, bonded and insured.
Renton averages 5.8 in of snow per season and only 1.9 days a year with 1 in or more. Storms are rare, so most sites have no plan until one hits. Call 206-809-9669 to set up service before the next event.
Sources: NOAA and National Weather Service records for Renton, 2005–2026.
A construction site needs more than a cleared driveway. We plow haul roads, gate entrances, laydown yards and parking areas. Crews shovel walkways, stairs and the paths to site trailers by hand. Ice melt goes down where workers and trucks need traction.
Renton's pattern shapes the work. The area logs 29 freezing nights from Oct to Apr, so frost and refreezing meltwater are more common than deep snow. Light-snow days that need deicing average 2.19 a year, and Winter Storm Warnings average 0.76 a year. Since 2005 there have been 15 winter storm and heavy snow reports. Recent events include Feb 12, 2021 (Winter Storm), Dec 28, 2021 (Cold/Wind Chill), Dec 19, 2022 (Winter Weather) and Feb 4, 2025 (Winter Weather).
Equipment and rates:
Each dispatch has a 2-hour minimum and a $275 trip charge for Renton (zone B).
Billed by the hour for the crew and equipment on site, plus materials.
| Plow truck with driver (Ram 3500) | $250 / hour |
| Plow and spreader truck with driver (Ram 5500) | $325 / hour |
| Compact track loader with operator (Kubota SCL1000) | $175 / hour |
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Ice melt, bagged | $45 / 50 lb bag |
| Bulk salt, applied | $300 / ton |
| Trip charge for Renton (zone B) | $275 / dispatch |
Prices approved Oct 2026.
Keeps trades and inspections on schedule despite winter weather; Clears haul roads and staging areas so deliveries are not delayed; Operators experienced navigating rough, unfinished terrain; Reduces on-site injury risk from ice around active work zones