Keeping You Moving. Beyond Expectations.
Worker-safety sidewalk clearing for Western Washington industrial facilities, keeping crew walkways between buildings and lots clear across every shift.
Industrial Facility Sidewalk Clearing in Woodinville covers the walks, entrances and pedestrian paths around your site. Washington Snow Removal is licensed, bonded and insured, and we dispatch from our Bothell yard, 17 minutes away.
Woodinville has 8 industrial sites on the map, each with lots, walks or entrances to keep clear. Under WMC 12.06.020, the owner of property abutting a public sidewalk must keep it safe and free of ice and snow at all times. Call 206-809-9669 to arrange service.
Sources: NOAA and National Weather Service records for Woodinville, 2005–2026.
Industrial sites have more foot traffic than most people expect. Staff arrive on early shifts, drivers walk to loading doors, and visitors cross from the lot to the front entrance. Our crews clear these paths by hand, with shovels, and treat them with ice melt so the surface stays safe.
Woodinville does not get much snow. The average is 8.8 inches per season, and there are about 2.7 days a year with 1 inch or more. About 76% of winters have at least one such day. The bigger problem is ice. There are 32 freezing nights from October to April. On Dec 23, 2022, freezing rain was reported 2 miles northwest of Woodinville, in Kenmore and near Bothell. A thin glaze like that can shut down a walkway even when no snow falls.
Because the city rule says sidewalks must be safe at all times, a plan matters more than a plow schedule. Here are our rates:
Each dispatch has a 2-hour minimum.
Billed by the hour for the crew and equipment on site, plus materials.
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Compact track loader with operator (Kubota SCL1000) | $175 / hour |
| Ice melt, bagged | $45 / 50 lb bag |
| Trip charge for Woodinville (zone A) | $200 / dispatch |
Prices approved Oct 2026.
Woodinville has 8 industrial sites on the map, each with lots, walks or entrances to keep clear.
Source: OpenStreetMap contributors, Oct 2026. Named sites are examples of local facilities, not customers.
Reduces Washington L and I worker injury claims and lost time; Shift-change timing matches around-the-clock operations; Yard walkways and gate approaches cleared, not just lots; Targets meltwater refreeze between heated and cold zones; Keeps production moving without weather-related stoppages