Keeping You Moving. Beyond Expectations.
We evaluate roof snow loads so you know whether accumulation has reached a dangerous weight.
Snow load assessment is a check of how much weight snow and ice are putting on a roof or structure. In University Place, snow is infrequent. The average is 5.4 in per season, and only 1.5 days a year bring 1 in or more. But when snow does fall, it can matter.
Washington Snow Removal is licensed, bonded and insured, and based in Bothell, WA. We assess snow on roofs and decks at University Place properties and tell you what we see. To schedule a visit, call 206-809-9669.
Sources: NOAA and National Weather Service records for University Place, 2005–2026.
An assessment starts with a look at the roof, decks, awnings and any flat or low-slope areas where snow can collect. We note how deep the snow is, whether ice has formed, and where drifts or sliding snow could be a problem.
University Place sees few big storms. The largest since 2005 was 10.8 in, and the snowiest season, 2008-09, totaled 15.5 in. Spotters measured 7 in in University Place on Feb 14, 2021, and 6 in on Feb 9, 2019. Nearby Tacoma reported 7.5 in on Jan 18, 2012. The record daily snowfall at Mcmillin Rsvr is 16.0 in, set in 1974.
The area also has about 36 freezing nights from Oct to Apr. Snow that melts by day and refreezes at night can leave ice on a roof or deck. An assessment looks at both the snow and the ice under it.
What a visit can include:
Our Bothell yard is 82 minutes from University Place. The trip charge for University Place (zone C) is $350 per dispatch. Crew member time for shoveling, sidewalks and hand work is $110 per person-hour.
Billed by the hour for the crew and equipment on site, plus materials.
| Crew member (shoveling, sidewalks, hand work) | $110 / person-hour |
| Trip charge for University Place (zone C) | $350 / dispatch |
Prices approved Oct 2026.
Real weight data instead of guessing from snow depth; Recognition of how heavy saturated Northwest snow truly is; Clear guidance on whether removal is needed; Early warning before a load threatens the structure