How We Clear Bike Lanes in Burien, WA
Bike lane clearing means getting the full width of the lane down to a surface a rider can use, then treating it so it does not refreeze. Lanes are tight and often sit beside curbs, parked cars and storm drains. Plows can push snow into the lane, so we clear with care and watch where the piles go.
Burien sees only 1.7 days a year with 1 in or more of snow, and snow sits on the ground about 3 days a year. The bigger issue is ice. There are 28 freezing nights between October and April, and about 2.43 light-snow days a year need deicing. Freezing rain was reported at Seatac on Dec 23, 2022. A thin glaze like that is hard to see and dangerous on two wheels.
What the work can include:
- Hand shoveling and sidewalk-style clearing by crew members at $110 per person-hour
- A Kubota SCL1000 compact track loader with operator at $175 per hour for wider or deeper stretches
- Bagged ice melt at $45 per 50 lb bag
Burien is 47 minutes from our Bothell yard. The trip charge for Burien (zone B) is $275 per dispatch, and each dispatch has a 2-hour minimum.