What Bike Lane Clearing Involves in Tukwila
A bike lane is easy to block and hard to clear. Plows push snow to the curb, and that is where the lane sits. We remove that windrow, clear the lane edge to edge, and treat the surface so it does not refreeze into ice.
Tukwila's pattern shapes the work. Only 1.8 days a year bring 1 in or more of snow, so most winters need little plowing. The bigger issue is ice. There are 26 freezing nights from October to April, and about 2.62 light-snow days a year need deicing. Thin snow can still leave a slick lane.
Big storms do happen. Feb 12-15, 2021 brought 11.1 in, with 7.4 in on the biggest day. Jan 2012 and Dec 2021 each brought about 8.5 in. In a storm like that, a loader moves the heavy snow and crew members finish the edges by hand.
- Crew member: $110 per person-hour
- Compact track loader with operator (Kubota SCL1000): $175 per hour
- Bagged ice melt: $45 per 50 lb bag
- Trip charge for Tukwila (zone B): $275 per dispatch
Each dispatch has a 2-hour minimum.