How We Clear Bike Lanes in SeaTac, WA
Bike lanes are narrow. Large plows can bury them or leave a berm along the curb. We clear them with hand crews and a compact track loader, which fits the lane without damaging curbs or markings.
SeaTac sees 1.7 days a year with 1 in or more of snow, and 62% of winters have at least one such day. Big events are uncommon but real. February 12-14, 2021 brought 12.2 in in total, with 8.8 in on the biggest day. Most winters, the larger problem is ice. The area has 28 freezing nights from October to April, so meltwater and slush can refreeze in the lane overnight.
A typical job can include:
- Shoveling or pushing snow out of the lane
- Removing berms left by street plows
- Spreading bagged ice melt on icy patches
- Clearing bike lane edges near drains and crossings
Pricing is simple. Crew members are $110 per person-hour. A Kubota SCL1000 compact track loader with operator is $175 per hour. Bagged ice melt is $45 per 50 lb bag. SeaTac is trip zone B, at $275 per dispatch. Each dispatch has a 2-hour minimum. Our yard is 48 minutes away in Bothell.