Keeping You Moving. Beyond Expectations.
Worker-safety sidewalk clearing for Western Washington industrial facilities, keeping crew walkways between buildings and lots clear across every shift.
Industrial sites run multiple shifts, so employees cross yard walkways, break-area paths, and gate approaches at all hours in the dark. An icy connector between the parking lot and the plant floor is a Washington L and I claim waiting to happen, and one that halts production while it is investigated. We clear the pedestrian routes your workforce actually uses and time service to shift changes rather than a single morning pass. Because these walks often run beside heated buildings and cold yards, meltwater refreezes fast, and our traction treatment targets those transition zones.
Reduces Washington L and I worker injury claims and lost time; Shift-change timing matches around-the-clock operations; Yard walkways and gate approaches cleared, not just lots; Targets meltwater refreeze between heated and cold zones; Keeps production moving without weather-related stoppages
1) Identify worker walkways between lots, gates, and buildings; 2) Time clearing to shift changes across the day and night; 3) Treat refreeze-prone transitions beside heated structures; 4) Report conditions to the site safety contact each visit
Total footage of yard and connector walkways; Number of shifts requiring timed coverage; Gate, break-area, and time-clock approaches included; Refreeze zones needing repeated traction treatment; Overnight and weekend response requirements
Industrial demand holds from December through February, when overnight shifts face the worst refreeze on yard walkways before dawn.